top of page
SHARPESOFT
BLOG
GET THE LATEST NEWS
Search


Copy a Job with Indirect Items in Estimator
Indirect items are overhead costs that do not necessarily pertain to specific bid items, but to the overall job. Indirect item costs in this window are ultimately spread to all of your bid items, except for any subcontractor or joint venture costs. What this means is that if there is a set of indirect items that you know will be reliably used for multiple jobs, it's possible to set up a "template job" containing all of those indirect items already inserted. Then, you need to
Dylan C
Sep 282 min read
Â
Â
Â


Copying Prices From Another Job in SharpeSoft Estimator
How to When copying bid items, especially between jobs, it's important to remember there are options present within Estimator for registering any changes between prices. This article concerns specifically the option Prompt to keep existing item detail costs during item copy. This is done from the Options tab within the Preferences window. It's located within the Defaults menu on the toolbar. In practice, If the box is NOT checked and you copy an item from another job, the sys
Dylan C
Jun 12 min read
Â
Â
Â
bottom of page
